Education Construction
Assembly Tooling Facility
Major HVAC upgrade to a temperature critical manufacturing facility
Major HVAC upgrade to a temperature critical manufacturing facility to accommodate the installation of four hi-tech tooling machines. A feasibility study was conducted to assess the viability for incorporating the new machines and the associated impact on the HVAC equipment. New and upgraded HVAC plant provided along with a fully integrated BEMS controls system to maintain the temperature critical environment.
BAE Systems, Samlesbury