Commercial Construction
Zone 5 Facility
Beech Jackson Partnership completed the mechanical & electrical services design using a design & build form of Contract with novation to the Principal Contractor and took the project from concept through to completion.
The Zone 5 Facility is a new build development which houses an ISO8 clean room, cure & debag area, tools & parts marshalling, autoclave and office accommodation. The Facility provides the capability for carbon fibre manufacturing. Due to the programme constraints, an enabling works package was completed which included drainage diversions, water main diversion and procurement of the HV switches and transformer. New incoming water, gas and electric utility services were required to the new development and were connected to the existing site infrastructure.
The Facility also had a requirement for compressed air and nitrogen generation / provision. This was provided by new incoming supplies connected to the existing generation equipment. The M&E services design also incorporated the LTHW boiler plant & distribution, centralised chilled water system with free cooling, mechanical ventilation incorporating 7No. air handling units, LEV extract systems, compressed air, centralised vacuum system, domestic water services, power, general & emergency lighting, lightning protection, CCTV, access control, intruder alarm systems, data along with fire sprinkler suppression system. The project handover was phased with early handover of the main services completed to allow installation of the Autoclave 51.
Project Core
The project included the mechanical & electrical services design using a traditional form of Contract and we took the project from concept through to completion. The building incorporated secure areas and the M&E services installations formed key parts in the building design to ensure that all major services and distribution equipment etc. were housed outside of the occupied secured zones, therefore limiting the requirement for maintenance staff to enter the secure areas.
The requirement to ensure the secure areas were securely protected with M&E services fully maintainable resulted in significant building design decisions being made. This resulted in housing the main services equipment outside of the occupied secure zones. The mechanical services design incorporated new high efficiency condensing boiler plant, chilled water system, VAV air handling system to the secure areas, BEMS controls and domestic water services. The M&E services design also incorporated the CCTV, access control and intruder alarm systems along with specialist networks for secured data systems. Developed and included solutions for future proof services connections and strategies for inclusion with a future phase/extension.